Posted 11/22/24
Paving operations complete
Paving operations completed for the season.
View full information for Section One – Shady Spring to Beaver.
Posted 11/22/24
Paving operations complete
Paving operations completed for the season.
View full information for Section One – Shady Spring to Beaver.
Posted 11/22/24
Work update for Thanksgiving holiday
Expected break from significant work activities from November 25 through December 1. General construction activity will be resumed on December 2.
Posted 11/22/24
New construction on Rt. 19 and Rt. 3
Construction of retaining wall #2 between Exxon and Bobcat on Rt. 19 and the Trump Street Box Culvert expected to begin soon. Waterline construction expected to begin first or second week of December – working primarily from Rt. 3 toward Beaver. Continued utilities relocations throughout the project limits.
View full information for Section One – Shady Spring to Beaver.
COMPLETE
Paving at 5th Street; Fincastle Street
Paving operations beginning at 5th Street/Hampton/Underwood connector and Fincastle Street connector.
(Update 11/22/24)Â Paving operations completed for the season.
View full information for Section One – Shady Spring to Beaver.
COMPLETE
Lane closure on Whispering Pine Drive
Continued lane closure on Whispering Pine Drive with water line installation. Flagging operation continued during working hours.
View full information for Section Two – Beaver to S. Eisenhower Drive/I-64.
Posted 11/11/24
Lane closer on Granby Circle
Continued lane closure on Granby Circle with water line installation. Flagging operations continue during working hours.
View full information for Section Two – Beaver to S. Eisenhower Drive/I-64.
Posted 11/1/24
Granby Circle closed for water line work
Granby Circle, near Grace Baptist Church, will be closed for water line construction.
View full information for Section One – Shady Spring to Beaver.