Currently active.
Phase 2A – Rt. 3 and Rt. 19 Intersection to Glenwood Lane:
Traffic is transitioned to the existing left shoulder for Phase 2A construction operations. Work to be expected in this phase includes water line relocations, sewer line relocations, drainage structure installation, and roadway build-up and widening.


