Currently active.
Phase 2B – Glenwood Lane to Ransom Drive:
Traffic is transitioned to the existing right shoulder for Phase 2B construction operations. Work to be expected in this phase includes water line relocations, sewer line relocations, drainage structure installation, and roadway build-up and widening.


